Scenario 9 - Morning Constellation

Date: Wednesday 17 March, 0600 Local (Galway runs UTC in March) Station: GW-01 Galway, Ireland - NATS Europe (planning authority for the network) Operator on Duty: You, qualified, solo Site Lead: Not on shift. The qualified operator holds the console. SH-02 Shetland: Fiona MacLeod, on console for the 06:19 pass, then outside on the feed heater until 07:00 Customer: Erik Halvorsen, Nordic Maritime Watch (standing collect on the 06:18 SAR-1 window)

Evening shift’s last contact was the 22:41 SAR-2 pass; modem 1 is still on 1,370 and the analyzer is at its default. Overnight quiet, no contacts worked. GW-01 reference locked all night, no holdover, amplifier idle. Six contacts on the board for the day, none allocated. The Nordic Maritime Watch standing collect is on the board as priority 1 at 06:18.

Both sites want a full sweep before anything is committed: board, reference, receive chain, transmit chain. Plan is unbuilt. First window is in eighteen minutes.

  • Night shift (turnover log, 0554)

Fiona (text, 0607):

“On console since half five and I’ve not touched the equipment, so what your console shows for my site is what I’ve got. I’ll take the seventy-three at 06:19 myself - I want eyes on the pedestal through the top - and then I’m outside on the heater cable till seven. The half-past SAR-2 is yours from there. Modem’s on 1414 for mine; don’t move it till I’m off.”


Item Value
Customer Erik Halvorsen, Nordic Maritime Watch
Requirement MERIDIAN-SAR-1 imagery from the 06:18 Galway window, every day this week
Priority 1
Delivery Decoded frames on the pass; customer status at the end of the morning windows
Customer preference Coverage and commitment. He does not read C/N figures.

Today’s Contacts (epoch 06:00:00 UTC, 0° horizon)

Section titled “Today’s Contacts (epoch 06:00:00 UTC, 0° horizon)”
Contact ID Satellite Horizon Opens Closes Priority
M-SAR1-GW MERIDIAN-SAR-1 Galway, 30° pass 06:18:00 06:27:30 1
M-SAR1-SH MERIDIAN-SAR-1 Shetland, 73° pass 06:19:10 06:29:10 2
M-SAR2-SH MERIDIAN-SAR-2 Shetland, 23° pass 06:30:00 06:39:20 1
M-SAR2-GW MERIDIAN-SAR-2 Galway, 25° pass 06:32:00 06:41:20 1
M-SAR1-GW-2 MERIDIAN-SAR-1 Galway, second orbit, 18° 07:49:50 07:59:00 3
M-SAR2-SH-2 MERIDIAN-SAR-2 Shetland, second orbit, 5° graze 08:02:00 08:08:10 3

Priority 1 and 2 contacts must be assigned for the plan to read DECONFLICTED. The two priority 3 second-orbit contacts may be assigned or left unassigned; that is a planning decision, and the customer will be told which way it went.

Pair Overlap Constraint
M-SAR1-GW and M-SAR1-SH 06:19:10 to 06:27:30 Cannot both sit on one site
M-SAR2-SH and M-SAR2-GW 06:32:00 to 06:39:20 Cannot both sit on one site
Contact Site Operator
M-SAR1-GW 06:18 GW-01 You. Erik’s collect.
M-SAR1-SH 06:19 SH-02 Fiona, on her own console. Leave her modem on 1,414 until she is off.
M-SAR2-SH 06:30 SH-02 You, remote from this console. Fiona is outside from 06:29. SH-02 has no unattended-pass sign-off yet; it needs a human.
M-SAR2-GW 06:32 GW-01 Galway, unattended. Armed by you before you leave the console; checked by you when you are back, before it sets at 06:41.

Contact AOS Rise az Max Elevation LOS Track
MERIDIAN-SAR-1 #1 06:18:00 143° 30.5° at 06:22:47, 716 km 06:27:33 (az 355°) Northbound, 9.5 min
MERIDIAN-SAR-2 #1 06:32:00 006° 25.2° at 06:36:43, 823 km 06:41:22 (az 224°) Southbound, 9.4 min, unattended
MERIDIAN-SAR-1 #2 07:49:51 200° 18.3° at 07:54:23, 1,021 km 07:58:58 Second orbit, P3
MERIDIAN-SAR-2 #2 08:04:53 341° 2.1° 08:09:14 Graze; below the Galway mask
Contact AOS Rise az Max Elevation LOS Track
MERIDIAN-SAR-1 #1 06:19:07 167° 72.8° at 06:24:05, 409 km 06:29:04 (az 344°) Northbound, 9.9 min, Fiona’s
MERIDIAN-SAR-2 #1 06:30:00 011° 23.0° at 06:34:38, 879 km 06:39:17 (az 233°) Southbound, 9.3 min, yours, remote
MERIDIAN-SAR-2 #2 08:01:59 001° 4.8° 08:08:10 Graze, P3

The second-orbit contacts are ninety minutes out. Once the morning passes are worked the scheduler will offer to skip ahead; the skip stops two minutes before the next pass at either site and is refused while a timed step is running. A skip taken before the morning windows are worked forfeits them.

Pass Decode window Peak C/N
SAR-1 from Galway, 30° C/N ≥ 8 dB about 06:20:30 to 06:25:00 ~11 dB at 06:22:47
SAR-2 from Shetland, 23° C/N ≥ 7 dB about 06:32:50 to 06:36:20 ~9.7 dB at 06:34:38
SAR-2 from Galway, 25° (unattended) C/N ≥ 8 dB about 06:34:30 to 06:38:30; still ≥ 6 dB past 06:39 ~10 dB at 06:36:43

Shetland’s SAR-2 peak is about a decibel under Galway’s for the same bird: 879 km against 823 km, and two degrees lower. Every dB of difference between two sites should be explained by range and elevation.

Fiona’s 73° pass peaks at 409 km. Against Galway’s 716 km that is 20 log(716 / 409) = 4.9 dB less path loss, and almost no atmosphere that steep: about 16 dB at the top before the pedestal has its say. 73° is still tracking on a 10°/s pedestal; the keyhole is the last few degrees to the zenith.


Four checks per site, both from this console. SH-02 is checked with Shetland selected in the asset tree; Fiona has not touched her equipment, so its panels show what she has.

Check Reads on Nominal GW-01 action SH-02 action
Board Dashboard Only the RX AGC no-carrier warning (empty sky, not a fault) Confirm Confirm. A board with nothing tripped on a remote site says nothing about configuration; the next three checks do.
Reference GPS Timing GPSDO locked, 9 satellites, holdover clear Confirm Confirm; the GNSS antenna up there has been flaky in the wind
Receive chain RX Analysis LNB 13,100 MHz LO, reference locked, 60 K, thermally stable Retune modem 1 from 1,370 to 1,414 MHz; analyzer centre 1,389 MHz, span 2 MHz Read the LNB. Leave modem 1 on 1,414; it is Fiona’s SAR-1 carrier until 06:29
Transmit chain TX Chain BUC on external reference, current normal, under 70 °C; HPA output disabled Confirm cold: powered, locked, disabled Confirm cold

LNB high-side at both sites: IF = LO − RF (13,100 MHz LO).

Signal RF (MHz) IF (MHz) Format
SAR-1 imagery downlink 11,686 1,414 QPSK 3/4, 36 MHz
SAR-1 telemetry beacon 11,711 1,389 CW
SAR-2 imagery downlink 11,730 1,370 QPSK 3/4, 36 MHz
SAR-2 telemetry beacon 11,703 1,397 CW

All passes are receive-only. The delivery standard is 8 dB or better held with the modem locked on a Galway-class pass; Shetland’s lower SAR-2 pass is held at 7 dB. Digital links are a cliff, not a slope: above threshold the frames are the frames.


Equipment Status Notes
4 m Ku tracker Powered, manual, parked az 5° / el 3° Program-track slews to the 143° rise; SAR-2 is armed on program-track before you leave
LNB 13,100 MHz LO, reference locked Stable
GPSDO Locked, 9 satellites Verify, do not assume
RX modem 1 1,370 MHz / 36 MHz / QPSK 3/4 Evening shift’s SAR-2 carrier. Retune to 1,414 for the collect; back to 1,370 to arm SAR-2
Spectrum analyzer 1,414 MHz centre, 60 MHz span Move to the SAR-1 beacon, 1,389 MHz, 2 MHz span
BUC / HPA No drive / output disabled No uplink tasking this shift
Contact Plan console Six contacts, none allocated Reads UNALLOCATED
Equipment Status Notes
4 m Ku tracker Powered, manual, parked az 5° / el 3° Fiona program-tracks SAR-1 from 06:19; you program-track SAR-2 from 06:29
LNB 13,100 MHz LO, reference locked Stable
GPSDO Locked, 9 satellites Confirm from here
RX modem 1 1,414 MHz / 36 MHz / QPSK 3/4 Fiona’s. Retune to 1,370 MHz after 06:29, not before
Spectrum analyzer 1,414 MHz centre, 60 MHz span Move to the SAR-2 beacon, 1,397 MHz, after 06:29
BUC / HPA No drive / output disabled No uplink tasking

  • Brief read; six contacts, who flies what, and the plan rule understood
  • Dashboard: only the RX AGC no-carrier warning on GW-01 (noise only, empty sky); no faults
  • GPS Timing: GW-01 GPSDO locked, not in holdover
  • RX Analysis: LNB 13,100 / stable; modem 1 to 1,414 MHz; analyzer 1,389 MHz, 2 MHz span
  • TX Chain: BUC on reference, current normal, HPA output disabled
  • M-SAR1-GW and M-SAR2-GW on GW-01; M-SAR1-SH and M-SAR2-SH on SH-02; reads DECONFLICTED
  • Second-orbit contacts: decision made, either way
  • SH-02 selected; Dashboard: only the RX AGC no-carrier warning, no faults
  • GPS Timing: SH-02 GPSDO locked, not in holdover
  • RX Analysis: SH-02 LNB 13,100 / stable; modem left on 1,414
  • TX Chain: SH-02 BUC on reference, under 70 °C; HPA output disabled
  • GW-01 selected; program-track MERIDIAN-SAR-1; beacon on RX analysis
  • Modem locked on 1,414 MHz, C/N ≥ 8 dB through culmination

Arm Galway, take Shetland (06:23 – 06:30)

Section titled “Arm Galway, take Shetland (06:23 – 06:30)”
  • GW-01: modem 1 to 1,370 MHz; program-track target MERIDIAN-SAR-2
  • 06:29, SH-02 selected: modem 1 to 1,370 MHz; analyzer centre 1,397 MHz
  • SH-02 program-track MERIDIAN-SAR-2; imagery carrier on Shetland’s RX analysis
  • SH-02 modem locked on 1,370 MHz, C/N ≥ 7 dB through culmination (06:34:38)
  • GW-01 selected before 06:41: pedestal program-track locked on SAR-2, modem locked, C/N ≥ 6 dB on the way down
  • Morning report and customer status to Erik: what was captured, what is committed, what is best-effort

Nobody built this plan for you and nobody is going to check it before Fiona flies her half of it. The sweeps are the difference between a plan and a hope; the plan is the difference between two sites and one; and the unattended pass is the difference between a network and two consoles.

Erik wants one sentence at 06:42. Make sure it is true.

Good luck.