Scenario 5 - Shetland Comes Online

Date: Friday, 1340 Local (Galway runs UTC in March) Station: GW-01 Galway, Ireland - NATS Europe (planning authority for the network today) Operator on Duty: You Site Lead: Charlie Brooks (on-site; flies the Galway SAR-1 pass himself) SH-02 Shetland: Fiona MacLeod, at the pedestal for the first window, on console after

Shetland signed its acceptance card overnight, which makes NATS Europe a network as of this morning and makes somebody responsible for deciding which site takes which pass. That is the console you are sitting at.

Four contacts today, two birds, both sites can see all four. Build the plan. Then - Fiona is out at the pedestal for the first window - fly Shetland’s from here. I will take the Galway one myself; it is my station too.

  • Charlie (text, 1339)

Fiona (text, 1346):

“Morning Galway. Wind’s forty knots gusting fifty-five and the dish is rated for worse, so I’m not worried and neither should you be. Send me the plan when it validates. If you give me a pass that overlaps one of yours I’ll assume it’s deliberate and then I’ll ring you.”

The first window is Shetland’s, at 14:01. Twenty minutes to sweep Galway, build and publish the plan, and make the Shetland station ready from three hundred miles away.


Station Location Antenna Frequency Plan Status
GW-01 Galway 53.27° N, 9.05° W 4 m Ku LEO tracker, 10°/s LNB LO 13,100 / BUC LO 12,600 Operational, your console
SH-02 Shetland 60.15° N, 1.15° W 4 m Ku LEO tracker, 10°/s LNB LO 13,100 / BUC LO 12,600 Operational as of 0600 today; remote console from GW-01

Same hardware, same frequency plan, seven degrees further north and eight degrees further east. Select SH-02 in the asset tree and every tab - GPS Timing, TX Chain, RX Analysis, ACU, Pass Schedule - is Shetland’s. The Pass Schedule tab predicts from whichever station is selected, and the two sites do not agree about the sky.


Today’s Contacts (epoch 13:40:00 UTC, 5° mask)

Section titled “Today’s Contacts (epoch 13:40:00 UTC, 5° mask)”
Contact ID Satellite Horizon AOS Rise az Max El LOS Priority
SAR1-SH MERIDIAN-SAR-1 Shetland 14:01:14 003° 24° at 14:04:42, 860 km 14:08:09 1
SAR1-GW MERIDIAN-SAR-1 Galway 14:03:10 000° 28° at 14:06:45, 761 km 14:10:18 1
SAR2-GW MERIDIAN-SAR-2 Galway 14:18:42 130° 25° at 14:22:10, 828 km 14:25:40 1
SAR2-SH MERIDIAN-SAR-2 Shetland 14:19:32 162° 86° at 14:23:23, 393 km 14:27:15 2

The plan requires priority 2 and above, so all four must be allocated. The plan does not validate with a required contact left unassigned.

Pair Overlap Constraint
SAR1-SH and SAR1-GW 14:03:10 to 14:08:09 Cannot both be on the same site
SAR2-GW and SAR2-SH 14:19:32 to 14:25:40 Cannot both be on the same site

SAR-1 is southbound on this orbit with its ground track west of Ireland. Shetland is further north, so the bird crosses its horizon two minutes before Galway’s; Shetland is also further east of the track, so it never climbs as high (24° against 28°). Same bird, same element set, different place to stand. A sun-synchronous orbit at 97° inclination runs nearly pole to pole, and a site at 60° N sees more of its passes per day than one at 53° N. SAR-2 goes 86° overhead at Shetland fifteen minutes later; over Galway it peaks at 25°.


Contact Site Operator
SAR1-SH 14:01 SH-02 You, remote from the GW-01 console (Fiona is at the pedestal)
SAR1-GW 14:03 GW-01 Charlie
SAR2-GW 14:18 GW-01 You
SAR2-SH 14:19 SH-02 Fiona (86° overhead; she will lose it briefly at the top, which is a later lesson)

LNB is high-side injection at both sites: IF = LO − RF (13,100 MHz LO).

Signal RF (MHz) IF (MHz) Format
SAR-1 imagery downlink 11,686 1,414 QPSK 3/4, 36 MHz
SAR-1 telemetry beacon 11,711 1,389 CW
SAR-2 imagery downlink 11,730 1,370 QPSK 3/4, 36 MHz
SAR-2 telemetry beacon 11,703 1,397 CW
Pass Decode window (C/N ≥ 8 dB) Peak C/N
SAR-1 from Shetland, 24° about 14:03:30 to 14:06:00 ~9.8 dB at 14:04:42
SAR-1 from Galway, 28° (Charlie) about 14:05:00 to 14:08:30 ~11 dB at 14:06:45
SAR-2 from Galway, 25° about 14:20:30 to 14:24:00 ~10 dB at 14:22:10

Shetland’s peak is about a decibel under Galway’s on the same bird: 20 log(860 / 761) is 1.1 dB of extra path loss, plus a little more atmosphere at the lower elevation. Every dB of difference between two sites should be explained by range and elevation. One that is not is a fault.


Display Meaning
Contact Allocation table Each contact with NORAD ID, priority, window, and a Site selector
Deconfliction: unassigned count Required contacts with no site
Deconfliction: conflict list Overlapping pairs booked to one station, shown as A × B on site
UNALLOCATED Required contacts remain unassigned
CONFLICT A site is double-booked
DECONFLICTED Plan is valid and ready to publish

Galway keeps the passes it has been working all week. The Galway-horizon contacts are yours; the question is what to do with the other two.


Equipment Status Notes
4 m Ku tracker Powered, manual, parked az 5° / el 3° Program-track available. Needs parking on az 130° / el 5° for SAR-2 after the hand-back.
LNB 13,100 MHz LO, reference locked Stable
GPSDO Locked, 9 satellites Disciplined
RX modem 1 1,414 MHz / 36 MHz / QPSK 3/4 Charlie’s SAR-1 pass. Retune to 1,370 MHz for SAR-2 after the hand-back.
Spectrum analyzer 1,414 MHz centre, 60 MHz span Move to the SAR-2 beacon, 1,397 MHz, after the hand-back.
BUC / HPA No drive / output disabled No uplink tasking this shift

SH-02 Shetland (as Fiona left it after her last acceptance run)

Section titled “SH-02 Shetland (as Fiona left it after her last acceptance run)”
Equipment Status Notes
4 m Ku tracker Powered, manual, stowed az 180° / el 3° against the wind Needs parking on the rise azimuth, 003° / el 5°, before 14:01
LNB 13,100 MHz LO, reference locked Stable since Tuesday
GPSDO Locked, 9 satellites Disciplined; confirm from here
RX modem 1 1,370 MHz / 36 MHz / QPSK 3/4 Her SAR-2 test carrier. Retune to 1,414 MHz for SAR-1.
Spectrum analyzer 1,414 MHz centre, 60 MHz span Move to the SAR-1 beacon, 1,389 MHz, 2 MHz span
BUC / HPA Muted / output disabled No uplink tasking

  • Dashboard: only the RX AGC no-carrier warning on GW-01 (noise only, empty sky); no faults
  • GPS Timing: GW-01 GPSDO locked, not in holdover
  • Contact Plan tab: SAR1-GW and SAR2-GW on GW-01
  • SAR1-SH and SAR2-SH on SH-02
  • Conflict list empty, unassigned count zero, plan reads DECONFLICTED
  • SH-02 selected in the asset tree
  • SH-02 GPS Timing: locked, not in holdover; TX Chain: BUC temperature normal; RX Analysis: LNB thermally stable
  • Pass Schedule (Shetland’s sky): SAR-1 AOS 14:01, rise az 003°, 24° peak
  • SH-02 RX modem 1: 1,414 MHz; analyzer centre 1,389 MHz, span 2 MHz
  • SH-02 ACU: tracker parked az 003° / el 5°, then program-track, target MERIDIAN-SAR-1
  • SAR-1 beacon on Shetland’s RX analysis
  • SH-02 modem locked on 1,414 MHz, C/N ≥ 8 dB through the high segment
  • Peak read at culmination: ≥ 9 dB at 24°
  • GW-01 selected; RX modem 1 to 1,370 MHz; analyzer centre 1,397 MHz
  • GW-01 ACU: parked az 130° / el 5°, then program-track, target MERIDIAN-SAR-2
  • Imagery carrier detected, modem locked, C/N ≥ 8 dB
  • Network log: site, who flew each contact, the number

A second site is capacity, not a spare. With one antenna, one of every overlapping pair was going to be dropped; with two and a valid plan, all four get worked. And a second site is only capacity if somebody can fly it: today that somebody is you, from a console three hundred miles from the dish.

Fiona is waiting on the plan and the weather up there is not improving. Give her something she can fly, then fly hers.

Good luck.