Scenario 2 - Proving the Link

Date: Tuesday, 1345 Local (Galway runs UTC in March) Station: GW-01 Galway, Ireland - NATS Europe Operator on Duty: You Site Lead: Charlie Brooks (on-site, front office, on the phone to Rotterdam)

Yesterday counted as first light. It does not count as acceptance. Rotterdam wants a number on a signed card before they schedule us for real tasking, and the number has to be predicted before it is measured or it is not a test, it is a guess that happened to work.

Survey figures are on the Link Analysis console. Read the ones you can check off the rack first. Do the arithmetic before AOS. The pass is seven minutes and the part you can measure on is about three.

  • Charlie (text, 1344)

GW-01 remains in commissioning. Yesterday’s contacts proved the chain can decode a MERIDIAN downlink; today’s test card GW-01-ATP-002 proves the station performs to the figure on the contract, and shows the measured curve follows the geometry.


Satellite Type Owner/Ops Status at Turnover
MERIDIAN-SAR-1 LEO SAR imager (sun-sync) MERIDIAN Constellation Operations (Rotterdam) Healthy; acceptance pass this shift
MERIDIAN-SAR-2 LEO SAR imager (sun-sync, offset plane) MERIDIAN Constellation Operations (Rotterdam) Healthy; not on the card, available for a regression run

Test: MERIDIAN-SAR-1 imagery downlink, C/N at maximum elevation Method: Predict from link budget; measure on the live receiver at three points on the pass; accept if the culmination measurement clears the demodulator threshold with margin and the shoulder readings follow the geometry.

Section titled “Site Survey Inputs (as loaded on the Link Analysis console)”
Parameter Value Source Verifiable on the rack?
Satellite EIRP 31.3 dBm MERIDIAN payload data sheet No
Slant range at max elevation 761 km Pass geometry, 28° culmination Pass Schedule tab
Free-space path loss at 11,686 MHz 171.4 dB From the range above Arithmetic
GW-01 receive antenna gain 50.4 dBi 4 m Ku, measured at the LNA flange (feed loss included) No
LNB gain 65 dB Survey; read it on RX Analysis Yes
System noise temperature 125 K LNB 60 K plus the antenna: sky, atmosphere, spillover and feed, about 65 K at 28° No (understand it)
Occupied bandwidth 36 MHz QPSK 3/4 imagery carrier Yes (modem)
Implementation loss 1 dB Pointing, polarization, modem No

Reference: C/N = EIRP + Grx − FSPL − Limpl − 10 log10(k · Tsys · B), with k = −228.6 dBW/K/Hz. Mind the EIRP unit; the survey quotes dBm.

Path loss scales with range squared: 20 log10(range ratio). At the 5° mask the slant range is 2,270 km, three times the culmination range, and FSPL is 180.9 dB, 9.5 dB worse. That is the whole reason the measurement window is the middle of the pass.

Check Criterion
Predicted C/N Within 1.0 dB of the design figure on the card (~11.4 dB)
Demodulator threshold 4.2 dB C/N (QPSK 3/4: Es/N0 5.0 dB in the 30 Msps carrier)
Required margin at acceptance 4.0 dB over threshold (C/N 8.2 dB), measured live at culmination
Shoulder readings C/N at ~15° elevation on the rising and setting legs, about 7 dB each; the two must agree
Measurement point On boresight under program-track, 14:06:45, 28°, 761 km

Pass Plan (from the scheduler, 5° mask, epoch 13:45:00 UTC)

Section titled “Pass Plan (from the scheduler, 5° mask, epoch 13:45:00 UTC)”
Contact AOS Rise azimuth Max Elevation LOS
MERIDIAN-SAR-1 14:03:10 000° 28° at 14:06:45, 761 km 14:10:18
MERIDIAN-SAR-2 14:18:42 130° 25° at 14:22:10, 828 km 14:25:40

Expected settled C/N on SAR-1 through the chain: 5.5 dB at 10°, about 7 dB at 15°, 8 dB at 18°, 10.9 dB at culmination, and the same numbers in reverse on the way down.

SAR-2 is not part of the test card. Run it as a regression: a second bird on a second geometry against the same model should come in around 10 dB at its 25° culmination.


LNB is high-side injection: IF = LO − RF (13,100 MHz LO).

Signal RF (MHz) IF (MHz) Format
SAR-1 imagery downlink 11,686 1,414 QPSK 3/4, 36 MHz
SAR-1 telemetry beacon 11,711 1,389 CW
SAR-2 imagery downlink 11,730 1,370 QPSK 3/4, 36 MHz
SAR-2 telemetry beacon 11,703 1,397 CW

Equipment Status Notes
4 m Ku tracker Powered, manual, parked az 5° / el 3° Program-track available; ephemeris current
LNB 13,100 MHz LO, gain 65 dB, reference locked 60 K noise temperature, thermally stable
GPSDO Locked, 9 satellites Disciplined
RX modem 1 1,414 MHz / 36 MHz / QPSK 3/4 Pre-tuned for SAR-1 imagery
BUC / HPA Muted / output disabled Receive-only card. Confirm both on TX Chain and leave them.
Link Analysis console Worksheet blank, test card loaded Predicted panel reads NO SOLUTION until you compute

  • TX Chain: HPA output disabled, BUC muted
  • GPS Timing: GPSDO locked; RX Analysis: LNB thermally stable, gain 65 dB
  • Link Analysis: survey inputs entered, C/N computed, predicted panel agrees with the card
  • Path loss at the mask worked out (180.9 dB) and the window understood
  • Pass Schedule: culmination time and elevation confirmed
  • Antenna: program-track enabled, target MERIDIAN-SAR-1, before 14:03
  • SAR-1 beacon visible on RX analysis
  • Rising leg: modem locked, C/N read near 15° (about 7 dB)
  • Culmination: live margin at or above 4.0 dB, Commit Link pressed
  • Setting leg: C/N read near 15° on the way down; compare with the rising leg
  • Measurement section of the card: prediction, measurement, margin, both shoulder readings
  • RX modem 1 retuned to 1,370 MHz for the SAR-2 regression run
  • Verdict signed: measured versus predicted, and why both are required

A measurement that matches a prediction is evidence the station is performing as designed. A good measurement from a broken model is luck, and Rotterdam does not schedule tasking on luck.

Two shoulder readings that agree prove the curve. One culmination reading that matches the model proves the station. Charlie will countersign whatever you put on the card. Make it a number you can defend.

Good luck.